Your Costs Changed Again. Did Your Prices Keep Up?

Most of the conversation about tariffs this year has been about rates. For a lot of wire and cable companies and distributors, the bigger change was what those rates apply to.

That matters because a tariff change doesn't arrive as one event. It arrives as a new cost in one system, and then it has to find its way to every price, quote and contract that depends on it. The time that takes is where the margin goes.

What Changed in 2026

A proclamation signed on April 2 reworked the Section 232 tariffs on aluminum, steel and copper, effective April 6. Tariffs now apply to the full customs value of covered articles and derivatives, regardless of metal content. Before that, tariffs on many derivative articles applied only to the metal content value.

The April structure included:

Then a June 1 proclamation made more changes, effective June 8 through December 31, 2027, including a reduced 15% rate on certain equipment and a lower threshold for products considered made entirely with U.S. metals.

More may be coming. As of mid-August, a decision on tariffs for refined copper was still pending.

Take a simple illustration: a product with a $10,000 customs value that contains $2,000 of metal. If it was previously taxed on metal content, the amount being tariffed just went from $2,000 to $10,000. Your cost model may still assume the first number.

The right rate depends on each product's classification and origin, so confirm yours with your customs broker. This article isn't trade or legal advice.

Follow One Cost Change

You can learn a lot from tracing a single change from start to finish. Pick one product family that took a tariff or metals increase this year, then ask:

  1. Who found out, and when? Did purchasing see it first? Finance? A supplier's email?
  2. Which products did it touch? Can you answer that from a system, or does someone need to build a list?
  3. What happened to open quotes? Were any still valid at the old cost? Did anyone know which ones?
  4. What happened to price lists and contract pricing? Which customers have terms that delayed or blocked the increase?
  5. When did the website and ERP match? Did customers see the same price everywhere?
  6. When did sales find out? Did they hear about it before a customer asked?

Now write down the number of days from the first step to the last. That's your pricing lag. For most companies, it's the first time anyone has measured it.

Where the Margin Leaks

The leaks tend to be ordinary. A quote stays valid for 30 days when costs moved in the second week. A price list update waits for the next scheduled review. A customer-specific contract gets missed because it lives in a separate file. Someone overrides a price to save a deal without knowing the cost underneath has changed.

None of these looks like a big mistake on its own. Together, they mean you can absorb a cost increase for weeks without ever deciding to.

What to Do This Quarter

For the metals side of that equation, Commergenix Price Director tracks copper, aluminum, steel and silver from the futures market every day, ties each product family to its metal, and shows how far prices need to move to hold margin.

Closing Perspective

We wrote earlier this year about why wire and cable pricing models are breaking. Tariffs are one more input moving faster than the systems built around it, and there is no reason to expect the next change to be the last.

You can't control when your costs change. You can control how long it takes your business to respond.